FREE TRIALEvery module free for 14 days — imports, drawings, BIM, proposals and IMPIC price revision.Start now →
Features

Everything an estimator needs, in one place

From the tender documents to the signed contract — and on to the site, with progress statements and price revision. Every module is free for 14 days.

Bill of quantities import

Turn the client's bill of quantities into an estimate in minutes

Upload the bill of quantities you received — Excel, CSV, PDF or BC3 — and uOrça finds the chapters, items, units and quantities for you. No more copying line by line.

  • Excel, CSV, PDF and BC3 (FIEBDC) files
  • Chapters, item numbers, units and quantities recognised automatically
  • Check the columns before anything is imported
Learn more →

Import bill of quantities ✓ 148 items found

FileMapa_Quantidades_Moradia.xlsx
SheetMQ
Description columnC · Designação
Quantity columnE · Quant.
1 Demolitions6 items
2 Earthworks9 items
3 Concrete structure21 items
7 Plumbing34 items
Measure on drawings

Measure lengths, areas and counts on PDF and AutoCAD drawings

Open the plans in uOrça and measure on screen. Every measurement goes straight to the item it belongs to, so the quantity in the estimate always matches the drawing.

  • PDF drawings and AutoCAD DXF files
  • Lengths, areas, counts and scale set from a known dimension
  • Each measurement linked to its estimate item
Learn more →

Planta_R-chao.pdf Scale 1:100

📏 Interior walls · length86.40 m
⬛ Floor tiling · area142.75 m²
• Sockets · count38 un
Linked to item3.4 Brick masonry 11 cm
BIM / IFC takeoff

Take quantities straight from the BIM model

Load the IFC model from Revit, ArchiCAD or any BIM software. uOrça lists walls, slabs, columns, doors and windows with their quantities, grouped the way you want to price them.

  • IFC 2x3 and IFC 4 files
  • Areas, volumes, lengths and counts per element type
  • Group by type, storey or material and send to the estimate
Learn more →

Moradia_T3.ifc 1,284 elements

IfcWall · Exterior wall 30 cm312.6 m²
IfcSlab · Floor slab 20 cm48.2 m³
IfcColumn · Pillar 30×3024 un
IfcWindow · W1 120×12016 un
Price library & breakdowns

Your prices, your breakdowns — reused on every estimate

Keep your materials, labour and equipment prices in one library and build price breakdowns from them. Change the price of cement once and every breakdown that uses it follows.

  • Resource prices: materials, labour and equipment
  • Price breakdowns with yields, waste and margins
  • Supplier price history and comparison
Learn more →

Breakdown · Brick masonry 11 cm per m²

Brick 30×20×11 · 13.5 un€4.73
Mortar M5 · 0.012 m³€1.18
Mason · 0.45 h€9.00
Helper · 0.45 h€8.10
Unit cost€23.01
Proposals & versions

Send a clear proposal — and know exactly what changed

Set your overheads and margin, choose what the client sees and print a professional proposal in PDF. Keep every version of the estimate and compare them side by side.

  • Overheads, margin and rounding per estimate or per chapter
  • Client proposal in PDF with your logo and conditions
  • Versions, comparison and ABC analysis of the biggest costs
Learn more →

Proposal · Moradia T3 Maia Version 3

Direct cost€182,400
Overheads 8%€14,592
Margin 12%€23,639
Proposal price€220,631
Compared with version 2−€6,240
Work & payment plans

Plan the work, the payments, the labour and the purchases

Spread each chapter over the months of the job and uOrça works out the work plan, the payment plan, the labour needed and what to buy and when — straight from the estimate.

  • Work plan (Gantt) by chapter or item
  • Payment plan for the client, month by month
  • Labour and purchase plans from the price breakdowns
Learn more →

Work plan 8 months

EarthworksM1–M2
Concrete structureM2–M4
MasonryM4–M6
Payment month 3€31,480
Mason hours month 5420 h
Progress statements & site control

Once the job is won: progress statements, extras and real costs

Turn the winning estimate into the project budget. Measure the work done each month, issue progress statements, record extra works and compare real costs with the estimate.

  • Monthly progress statements (autos de medição)
  • Extra works and work orders, kept apart
  • Purchases, suppliers, actual costs and site diary
Learn more →

Progress statement n.º 4 Approved

Work done this month€38,920
Accumulated€126,440 · 57%
Retention 5%€1,946
Extra works2 orders · €3,150
IMPIC price revision

Price revision with the official IMPIC indices

Revise prices on public and private contracts with the formulas of Decree-Law 6/2004. uOrça keeps the monthly IMPIC indices for materials, labour and equipment, so the revision is a few clicks.

  • IMPIC indices for materials, labour and equipment, every month
  • Formulas by type of work or your own coefficients
  • Revision per progress statement, ready to print
Learn more →

Price revision · auto n.º 4 Base month Feb 2026

M08 · Cement131.5 → 133.5
M01 · Aggregates161.7 → 163.1
E · Equipment141.3 → 142.0
Revision coefficient1.0124
Revision amount€483

Send your next proposal with uOrça

Start with the tender you are pricing now. If it doesn't save you time, it costs you nothing.

1

Sign upYour email and company name — the login code arrives in seconds.

2

ImportUpload the bill of quantities, drawings or BIM model.

3

Price itUse the starter price library or your own breakdowns.

4

SendPrint the proposal, the work plan and the payment plan.